The Logs are completed. Due to rain, snow and Deer season the work has slowed down. The studding for the first floor is going in so the 2nd floor can be put on. If the weather clears up the second floor should be completed by the end of the week. Ploof excavating completed back filling last Saturday. They also put hay down over the leach field. A small retaining wall on the south side was also added. We are still waiting for the power and the well to be started. Hopefully that will happen soon.
Monday, November 26, 2007
Logs Completed 2nd floor going up
Posted by
Unknown
at
Monday, November 26, 2007
0
comments
Friday, November 16, 2007
The Logs Are Going Up




John and his crew were working hard to complete the placing of the logs. It generally takes about a week but with the precut logs it has helped John complete the task earlier. The weather on Thursday was bad. It rained hard most of the day with some snow flurries. Hopefully the logs will be completed today. The windows were ordered yesterday and we should have power soon.
Posted by
Unknown
at
Friday, November 16, 2007
0
comments
Sunday, November 11, 2007
Floor Decking

The floor decking was completed on Friday. The logs start going up on Monday. I had to buy a generator for the construction because the power is still not connected.
Posted by
Unknown
at
Sunday, November 11, 2007
0
comments
Thursday, November 8, 2007
1st Floor Deck Framing - Basement Walkout




The first floor was laid today the plywood decking will be completed tomorrow. The logs will be started on schedule Monday. Today I bought a 6200 Watt generator for the construction and for emergency back up power. In two of the pictures you can see from inside the basement looking out. Notice the steel beam in the Prow area of the basement. A side view of the home shows both rock walls completed.
Posted by
Unknown
at
Thursday, November 08, 2007
0
comments
The Framing Has Started



The framing has started on our long awaited log home. In the pictures you can see the walk out area with our new rock retaining wall next to it. The flooring should be done by Monday and the logs will be going up on Tuesday. The weather will determine if they will work or not. Let's hope the weather holds up. If everything goes ok the logs should be up in about a week, then the roofing can go up.
Posted by
Unknown
at
Thursday, November 08, 2007
0
comments
Saturday, November 3, 2007
Septic System




Today the septic system was completed. The pipe was laid down and insulated. A support pipe was also put around the 4 " pipe so driving over it will be safe. The inspection will be on Monday so the rest of the system can be filled over. Wink, myself and one of Ploof's men helped put in the sonic tubes for the support of the decking. Each hole was dug to 4 feet. All 11 of them. It took most of the day but it's now done. The cement will be done on Monday afternoon.
Posted by
Unknown
at
Saturday, November 03, 2007
0
comments
Retaining Wall



Ploof Excavating was building a retaining wall for the new home. This will allow us to walk out on a level surface from the basement and will also keep the dirt where it should be. As you can see it looks awsome and will be a strong wall. He is also working on the septic system. We now have a septic tank. Today he will be digging the hole to the leach field. This will have to be inspected before it can be covered.
Posted by
Unknown
at
Saturday, November 03, 2007
0
comments
Wednesday, October 31, 2007
Basement Floor


KW poured the basement floor last week. The floor has two drains that Patti & I put in ourselves. Yes! we did dig the holes and put in the PVC pipe. It was hard digging but we managed with only a few cuts and scratches and or aches & pains. Anyway the floor looks great, nice and smooth. Construction was suppose to start this last Monday but they had to finish the last job they started while we were waiting for the bank this summer. I did talk to John from HS Construction and he gave me a list of materials to start for next Monday morning. Jim Ploof will work on the retaining wall in the front of the house tomorrow. Spafford Well drilling came out and checked out the area for the well. They said it will be soon!! The power poles will be set soon, possibly another 3 weeks. This will make it hard for John and his crew using generators. The weather seems to be holding out for us lets hope the bad weather comes after the roof is on in about 6 to 8 weeks. Ploof has also back filled around the foundation so it will be easier for John and his crew.
Posted by
Unknown
at
Wednesday, October 31, 2007
0
comments
Tuesday, October 23, 2007
Electric Power Update
I talked with CVPS today and they will go out and mark the location of the power pole. The metal beam will be delivered this week most likely tomorrow.
Posted by
Unknown
at
Tuesday, October 23, 2007
0
comments
Saturday, October 20, 2007
Foundation & Drains


Hello:
Patti & I went out to the site this afternoon to put in the two drains we will have in the basement. We will have one on the side under the bathrooms and one in the utility room. It took us about 30 minutes to dig the holes and put the pipe in. The back filling will happen on Wednesday or Thursday. Hopefully the tar will be sprayed on Wednesday before the back filling. Also the basement floor will be poured next week.
Posted by
Unknown
at
Saturday, October 20, 2007
0
comments