Thursday, April 17, 2008

Lot's of Progress





The kitchen wall is now in place as you can see from the picture. John also made the wall for the stairway. We had to make the upstairs bathroom one foot larger so we could put in the shower and tub we wanted so I included a picture of that as well. Work also continues on the roof. John has the roof about 80% done and it looks real nice. We had to take the dining room door out as well as one of the kitchen windows so my brother Peter could do the wiring for a switch box for the porch and outlets for the kitchen. There is a hole and channel in the frame work for the wire to rest in. Now that the wiring is done the windows can be installed permanent. All windows are in except the four in the basement. The front and back entrance door also need to be put in. The outside is looking great with only the great room log siding left to complete. The rear entrance needs to be made and the stairs and railing on the deck need to be completed. Macintyre plumbing will be bringing the new showers and tub hopefully this week.

Vermont Weather

View a flash tutorial on how to install netWeather: http://netweather.accuweather.com/tutorial/tutorial2.html.