Monday, April 7, 2008

Lot's of New Activity




Today was a busy day. We had two contractors working on site at the same time. Hutching the building contractor and Macintyre the plumber were working at the house today. The new furnace was put in along with some of it's connections. The new oil tank was installed as well. If you look on the picture on the north side you can see where the vent pipe is and the fill pipe for the fuel oil will be. The trim work was completed on the rear and the roof work has one more step towards completion. The entrance small porch will be the last thing going up. Some work is still needed on the south side roof structure as you can see in the picture, but with good weather expected for tomorrow they should get that completed. Then the shingles go up. Macintyre will be working on the furnace tomorrow as well. We have to make a change on the upstairs bathroom. The plumber checked the measurements and the tub and shower we wanted won't fit properly. So we have to make some changes again. At this point that's a minor problem. The snow is melting fast and the lake has opened quite a bit in the last few day's. It's all coming together finally. Yes!!!

Vermont Weather

View a flash tutorial on how to install netWeather: http://netweather.accuweather.com/tutorial/tutorial2.html.