We have been working on the fireplace and the moldings in between our busy schedules. The stairway steps are done and now the railings are left to fabricate and install. We still need to put in closet doors and finish the moldings and fireplace. We have been spending weekends at the lake working on every project we can. The framing for the fireplace took some time to complete as well as the design and fabrication of the mantle. As you can see the stone will be installed soon. We are waiting for a piece of Vermont grayish green slate for the base to be cut before I can install the stone.
Tuesday, March 3, 2009
March Update