The flooring is finally going down. Rick & Kate our friends from Lincoln Logs let us borrow their floor nail gun. I started last Friday and as of today the upstairs bedroom is completed and the loft is started. I still have to go to NH to pick up the rest of the flooring. I hope to have it completed soon. I still have a little dry wall taping left in the 1 st floor bedrooms and some molding left to do. Many little odds and ends and the fireplace needs to be completed. I am waiting for the wood stove chimney to go in before I start that project. It's nice to see it all come together, but I'll be glad when I can relax and enjoy it.
Monday, November 17, 2008
The Floor is GOING DOWN!
Posted by
Unknown
at
Monday, November 17, 2008
3
comments
Subscribe to:
Posts (Atom)
Vermont Weather
View a flash tutorial on how to install netWeather:
http://netweather.accuweather.com/tutorial/tutorial2.html.