Work on the great wall continues. Patti & I have spent the last two days working on the great room. The stagging has been the best helper for this on going portion of this job. It has been a challenge to get the cut's just right and very tiring because of the long days. We have made much progress but still have a long way to go. I have both sides going at the same time and moving the staging to be able to reach each area is a challenge. I have most of the trim done and as you can see by the picture we have a two color accent. We wanted to make it rustic looking but give it some charm at the same time. Each piece has been sealed with two coats of a min- wax clear satin sealer before it is put up. Patti has been a great help in cutting some of the boards while I'm up on the scaffolding. It has saved so much time and her cuts are right on. We still have a long ways to go but with some hard work ahead we should be done this fall.
Tuesday, July 29, 2008
Great Wall Work
Posted by
Unknown
at
Tuesday, July 29, 2008
0
comments
Subscribe to:
Posts (Atom)
Vermont Weather
View a flash tutorial on how to install netWeather:
http://netweather.accuweather.com/tutorial/tutorial2.html.