Tuesday, July 29, 2008

Great Wall Work





Work on the great wall continues. Patti & I have spent the last two days working on the great room. The stagging has been the best helper for this on going portion of this job. It has been a challenge to get the cut's just right and very tiring because of the long days. We have made much progress but still have a long way to go. I have both sides going at the same time and moving the staging to be able to reach each area is a challenge. I have most of the trim done and as you can see by the picture we have a two color accent. We wanted to make it rustic looking but give it some charm at the same time. Each piece has been sealed with two coats of a min- wax clear satin sealer before it is put up. Patti has been a great help in cutting some of the boards while I'm up on the scaffolding. It has saved so much time and her cuts are right on. We still have a long ways to go but with some hard work ahead we should be done this fall.

Vermont Weather

View a flash tutorial on how to install netWeather: http://netweather.accuweather.com/tutorial/tutorial2.html.