Saturday, September 6, 2008

Walking the Plank




Its been a little tricky lately. If you look closely at the picture you will notice the planks that come off the scaffolding. The only way I could reach the area over the stairs was to attach planks to the wall and rig up the step ladders to hold the planks. This is the part that I've dreaded from the start. The good news is that I only have three rows of T & G left in the great room which happens to be over the stairs. I had to order more wood yesterday and it should be delivered today so I can complete that area. I also have good news that I received a 9.5 judging from Patti for my plank walk. Its been slow going but the finish product is going to be wonderful. I have also installed some lights and tiled the front entryway with the Mosaic. I tiled the down stairs bathroom sink that we designed. The grout work on both will be completed today. We will have the gas installed on the 15 of Sept and the appliances are ordered. I hope to have the walls completed soon, I just have to push myself. I'll keep everyone updated when I can.

Vermont Weather

View a flash tutorial on how to install netWeather: http://netweather.accuweather.com/tutorial/tutorial2.html.