Wednesday, April 8, 2009

Closet Door Installed

Work continues on the log home. I finally installed the closet door in the front entrance. We could not fine a door that would fit the opening we originally had so we bought two 36" wood doors with panels and made the opening two feet smaller. We decided to do it this way because the custom door we would have had to order would have cost around 500.00 per door and our total for two I installed were just 160.00. I have a little taping to do but the results look great and we saved money. The slate company has not returned any of my calls so it appears that they will not be supplying the slate we need for the fireplace. We are looking at another source for the slate.

Vermont Weather

View a flash tutorial on how to install netWeather: http://netweather.accuweather.com/tutorial/tutorial2.html.