Roof Work Continues





With warmer weather for cased for the next week work on the main roof structure should be completed. As you look at the pictures you can see some progress from later day's. Last Friday some of the roof was done as well as some of the sofit. The windows are scheduled for delevery on the 11th and hopefully John and his crew will be ready for them. The roof is supposed to be completed before the windows are installed. The reason is because if something falls from the roof it doesn't break the window. In one of the pictures it shows the upstairs area by the staircase. We are hoping Verizon will be installing our new power poles this week. This is going to be perfect weather for that project with temperatures projected nearing 55 on Wednesday.