Wednesday, May 23, 2007

Preliminary Drawings Update

Patti & I have signed off on the first rough draft of the preliminary drawings of the log home. The actual drawings will arrive in about 3-4 weeks. Check out the new pictures!! Also note that the kitchen/dining room will be switched to the other side of the house. These changes will be obvious when the preliminary's arrive. A 2 1/2 car garage will also be added to the drawings. The cost of the whole project has risen as well. I also received a updated proposal from the builder for the added changes. I will share the cost of this project at a later time, because it seems to change daily. I am still waiting for the Plumber & Heating person to call back. Also notice the new pictures of the Bee yard. The girls seem to be very happy at there new home and are very busy working the spring bloom.

Vermont Weather

View a flash tutorial on how to install netWeather: http://netweather.accuweather.com/tutorial/tutorial2.html.