The first floor was laid today the plywood decking will be completed tomorrow. The logs will be started on schedule Monday. Today I bought a 6200 Watt generator for the construction and for emergency back up power. In two of the pictures you can see from inside the basement looking out. Notice the steel beam in the Prow area of the basement. A side view of the home shows both rock walls completed.
Thursday, November 8, 2007
1st Floor Deck Framing - Basement Walkout
Posted by
Unknown
at
Thursday, November 08, 2007
0
comments
The Framing Has Started
The framing has started on our long awaited log home. In the pictures you can see the walk out area with our new rock retaining wall next to it. The flooring should be done by Monday and the logs will be going up on Tuesday. The weather will determine if they will work or not. Let's hope the weather holds up. If everything goes ok the logs should be up in about a week, then the roofing can go up.
Posted by
Unknown
at
Thursday, November 08, 2007
0
comments
Subscribe to:
Posts (Atom)
Vermont Weather
View a flash tutorial on how to install netWeather:
http://netweather.accuweather.com/tutorial/tutorial2.html.