The first floor was laid today the plywood decking will be completed tomorrow. The logs will be started on schedule Monday. Today I bought a 6200 Watt generator for the construction and for emergency back up power. In two of the pictures you can see from inside the basement looking out. Notice the steel beam in the Prow area of the basement. A side view of the home shows both rock walls completed.
Thursday, November 8, 2007
1st Floor Deck Framing - Basement Walkout
Posted by
Unknown
at
Thursday, November 08, 2007
Subscribe to:
Post Comments (Atom)
Vermont Weather
View a flash tutorial on how to install netWeather:
http://netweather.accuweather.com/tutorial/tutorial2.html.
No comments:
Post a Comment