Monday, November 26, 2007

Logs Completed 2nd floor going up



The Logs are completed. Due to rain, snow and Deer season the work has slowed down. The studding for the first floor is going in so the 2nd floor can be put on. If the weather clears up the second floor should be completed by the end of the week. Ploof excavating completed back filling last Saturday. They also put hay down over the leach field. A small retaining wall on the south side was also added. We are still waiting for the power and the well to be started. Hopefully that will happen soon.

Vermont Weather

View a flash tutorial on how to install netWeather: http://netweather.accuweather.com/tutorial/tutorial2.html.