With summer almost over the interior has transformed into a variety of small projects going on daily. I installed the kitchen floor yesterday and grouted it today. I installed the porch light today as well. Patti painted the downstairs bathroom this past weekend a light blue. I installed the fans/lights in both bathrooms and will be installing the other lights this week over the vanity. As soon as I get the lights for each room they will be installed. Last Thursday our fireplace was installed. The stone work will come later this fall. I also installed the window seat in the kitchen. It will be padded later and the front trim will go on when I complete that. Some more trim work was completed in both bathrooms. The propane gas company will come next week to install the gas for the fireplace and stove. Macintyre will come soon the hook up the rest of the plumbing for the sinks and showers. They also will get the hot water hooked up which means we will need some fuel oil for the house. At the present time oil prices have fallen, but at this point I'm hoping the price will stabilize. The extra insulation and the new modern efficient furnace should cut down on the cost of heating. I hope!!!! I still have some ceilings to complete downstairs and upstairs. This is going to take some extra time to reach the high areas. I have to order some more T & G wood for that project.
Wednesday, August 20, 2008
Interior Progress Still Going Strong
Posted by
Unknown
at
Wednesday, August 20, 2008
1 comments
Subscribe to:
Posts (Atom)
Vermont Weather
View a flash tutorial on how to install netWeather:
http://netweather.accuweather.com/tutorial/tutorial2.html.