Work has started on the main roof system. At this point the back half was started first. The front of the log home with the prow will be the next step. John & his crew need to install the main beam before the wall and roof rafters are put in. One of the pictures taken inside the 2nd bedroom show the area where the bathroom will be, the loft is to the right. The picture taken from the loft down towards the dining/kitchen. When the roof is completed this view will have a dramatic change.
Saturday, December 22, 2007
Posted by
Unknown
at
Saturday, December 22, 2007
0
comments
Subscribe to:
Posts (Atom)
Vermont Weather
View a flash tutorial on how to install netWeather:
http://netweather.accuweather.com/tutorial/tutorial2.html.