As work continues on the log home progress on the outside is getting near completion. As the inside plumbing has been roughed in the electrical is next to get into full swing. Two of the pictures shows the bathrooms with the plumbing roughed in. As you can see by the entrance side we now have a front door installed. All of the siding is completed and the drip edge over the windows is in place. Jim Ploof came today and graded in the front. We finally got rid of that plank!! Tomorrow we are going to talk to some one about the kitchen cupboards. I had a chance to try the fishing this year and check out the picture. A nice bass about 15" just under 2 lbs. I got him on my second cast. I did put him back because the season hasn't started yet. It looks like another good year! Hutching Has the entry porch to put in and some interior work some roof work and the porch railings/steps and he will be done. The bees are doing great and I am hoping for another great year working with them.
Saturday, May 3, 2008
Outside Work Almost Completed
Posted by
Unknown
at
Saturday, May 03, 2008
0
comments
Subscribe to:
Posts (Atom)
Vermont Weather
View a flash tutorial on how to install netWeather:
http://netweather.accuweather.com/tutorial/tutorial2.html.