Ploof excavating has been working on the property leveling and bringing top soil so grass can be planted. He has also placed some flat rocks in our walkway as well as a rock front step. The picture does not look as good as it does in person. These rocks are quite large but were flat enough to use in our front walk way. We had him take a few more trees taken down so we will have a larger yard. The appliances arrived today and the propane gas co was here installing the gas lines for the stove and fireplace. They still have to bring the tank and hook it up because they had to order new tanks, this should happen hopefully this week. I have been installing T & G boards up in the master bedroom. I should be done soon because this area is quite easy compared to the great room. As you can see by the pictures the room is almost done. I should have the ceiling finished by this weekend. We are still waiting for some of the bathroom faucets to come in, they had to be special ordered. This has been a busy summer and I hope to have most of it done by the end of November.
Monday, September 15, 2008
Lots of Changes
Posted by
Unknown
at
Monday, September 15, 2008
0
comments
Subscribe to:
Posts (Atom)
Vermont Weather
View a flash tutorial on how to install netWeather:
http://netweather.accuweather.com/tutorial/tutorial2.html.