KW poured the basement floor last week. The floor has two drains that Patti & I put in ourselves. Yes! we did dig the holes and put in the PVC pipe. It was hard digging but we managed with only a few cuts and scratches and or aches & pains. Anyway the floor looks great, nice and smooth. Construction was suppose to start this last Monday but they had to finish the last job they started while we were waiting for the bank this summer. I did talk to John from HS Construction and he gave me a list of materials to start for next Monday morning. Jim Ploof will work on the retaining wall in the front of the house tomorrow. Spafford Well drilling came out and checked out the area for the well. They said it will be soon!! The power poles will be set soon, possibly another 3 weeks. This will make it hard for John and his crew using generators. The weather seems to be holding out for us lets hope the bad weather comes after the roof is on in about 6 to 8 weeks. Ploof has also back filled around the foundation so it will be easier for John and his crew.
Wednesday, October 31, 2007
Basement Floor
Posted by
Unknown
at
Wednesday, October 31, 2007
Subscribe to:
Post Comments (Atom)
Vermont Weather
View a flash tutorial on how to install netWeather:
http://netweather.accuweather.com/tutorial/tutorial2.html.
No comments:
Post a Comment