Today the septic system was completed. The pipe was laid down and insulated. A support pipe was also put around the 4 " pipe so driving over it will be safe. The inspection will be on Monday so the rest of the system can be filled over. Wink, myself and one of Ploof's men helped put in the sonic tubes for the support of the decking. Each hole was dug to 4 feet. All 11 of them. It took most of the day but it's now done. The cement will be done on Monday afternoon.