Monday, November 24, 2008

Upstairs Floors Completed



The upstairs floors were completed yesterday. The only thing left is moldings and the railings. Patti & I made a trip to Pick up some more flooring in NH on Saturday. We have eight boxes of flooring left to pick up that will make 43 boxes of flooring. We worked all weekend at the house and completed many projects. Patti worked on the painting and decorating. The hall was painted and the entry way color was changed. I put the 2nd coat of joint compound on the bedrooms downstairs and started the last coat. The closet ceiling was put in the linen closet. Sanding of the log walls to get rid of the strap marks left by sitting in the weather. I started putting up the loft railings of cedar logs last night before we left. Lots of trim work left to do but that will be started after the floor is done. In the loft picture shown you can see the wood shade I made that covers the fluorescent lights. I custom made this shade using pine and small birch branches to attach it to the wall.

No comments:

Vermont Weather

View a flash tutorial on how to install netWeather: http://netweather.accuweather.com/tutorial/tutorial2.html.