The upstairs floors were completed yesterday. The only thing left is moldings and the railings. Patti & I made a trip to Pick up some more flooring in NH on Saturday. We have eight boxes of flooring left to pick up that will make 43 boxes of flooring. We worked all weekend at the house and completed many projects. Patti worked on the painting and decorating. The hall was painted and the entry way color was changed. I put the 2nd coat of joint compound on the bedrooms downstairs and started the last coat. The closet ceiling was put in the linen closet. Sanding of the log walls to get rid of the strap marks left by sitting in the weather. I started putting up the loft railings of cedar logs last night before we left. Lots of trim work left to do but that will be started after the floor is done. In the loft picture shown you can see the wood shade I made that covers the fluorescent lights. I custom made this shade using pine and small birch branches to attach it to the wall.
Monday, November 24, 2008
Upstairs Floors Completed
Posted by
Unknown
at
Monday, November 24, 2008
0
comments
Monday, November 17, 2008
The Floor is GOING DOWN!
The flooring is finally going down. Rick & Kate our friends from Lincoln Logs let us borrow their floor nail gun. I started last Friday and as of today the upstairs bedroom is completed and the loft is started. I still have to go to NH to pick up the rest of the flooring. I hope to have it completed soon. I still have a little dry wall taping left in the 1 st floor bedrooms and some molding left to do. Many little odds and ends and the fireplace needs to be completed. I am waiting for the wood stove chimney to go in before I start that project. It's nice to see it all come together, but I'll be glad when I can relax and enjoy it.
Posted by
Unknown
at
Monday, November 17, 2008
3
comments