Wednesday, September 10, 2008

Lights & Water











Today was a very productive day. Our water softener and filter was installed and the we now have pure soft water with no iron. The level of iron was at 9 which should have been zero. It also had tested for organic iron which a charcoal filter took care of. Now we won't get rust stains. The upstairs bathroom toilet was installed along with the water for the sink. I'll have the fixtures for the tub and shower by Friday. The down stairs bathroom sink was also installed today. If you look close you can see soft water coming out of the faucet. Patti and I designed and built the tile counter for the Mexican sink, Also the shower is installed downstairs. Notice the light above the sink and the trim around the sink. Nice touch Huh!! The kitchen sink water line and drain was also installed today.

Now lets talk about lights. Both closets now have lights. Both bathrooms have lights. The front hall entry has lights. Notice the high area T & G in the great room is completed when you look at the new ceiling light installed. I have also completed the sheet rock in the hall with the last coat of compound to go on tomorrow. Two wall lights are installed in the master bedroom. The T & G in the bedroom will start Friday. The oil tank was filled today and we will have hot water by this Friday. I have all the lights for over the doors in the great room which will be installed real soon. Appliances will arrive this Friday. We have low voltage lights outside to light up the house. It looks real cool in the evening with the accent lighting.

2 comments:

Tricia said...

Looks like you have been busy, good work!

Anonymous said...

The T & G looks great! It looks great! Love the color in the bathroom!!
-Stacers

Vermont Weather

View a flash tutorial on how to install netWeather: http://netweather.accuweather.com/tutorial/tutorial2.html.