Tuesday, July 1, 2008

Full Speed Ahead




The interior work is in a full speed mode. All of the insulation is in and the sheet rock is going up. I have put up 72 sheets of sheet rock already. Just a few more left. I have the first floor bedroom ceiling done in pine tongue and groove boards. The moldings are also done in that room. The kitchen moldings and wall are done. The kitchen cabinets are arriving tomorrow. I installed the tile in the tub area in the bathroom. I also tiled the bathroom floor upstairs. The wiring is going good. All of the outside outlets are working now. Patti and I also installed glass block tile in the bathroom upstairs. This will allow light to come in from the great room.