While nice warm days has given time to complete the outside work, which is now almost finished. The interior work is now in full swing. The plumbing is roughed in and the electrical is coming along very nice. John has the front entrance to complete and some finish trim work to complete and he will have that stage done. He will also be putting the railings on the porch and deck along with stairs for the back deck. Patti and I will be meeting with Lowe's on the kitchen plan tomorrow. We now have water flowing from the well and all doors are in place. The house will be locked from this point on. This has been a concern for me from the start. Builders Insulation will come tomorrow and price out the insulation for the house. Last week I put in three sonic tubes for the back deck that had to be moved. This was all done by hand including pouring the concrete. With this done he now can finish his work and I can be a few day's ahead.
Wednesday, May 14, 2008
Final Days of Exterior Work In Sight
Posted by
Unknown
at
Wednesday, May 14, 2008
Subscribe to:
Post Comments (Atom)
Vermont Weather
View a flash tutorial on how to install netWeather:
http://netweather.accuweather.com/tutorial/tutorial2.html.
1 comment:
Dad
Can't wait to see it this weekend!! It's coming along and looking great!
-Stacy