Today the electrical conduit was installed. Jim Ploof came out and dug the 3ft trench and put in two 2 1/2" conduit lines for the power and telephone. My brother Peter that owns Williamson Electric also installed the meter box on the side of the house. Service to the house will be 200amps. This will provide extra power for the house so that any additions added on to the power will be able to handle the load. I could have done it a little cheaper with 100amp service but wanted to make sure I will have enough power later and cut the cost of replacing the service. All of this work has to be completed and meet special electrical service requirements from Vermont utilities. In other words it was done right the first time and looks great. I am very happy with what was done today. This is just another step in the right direction. Patti & I have picked out the tubs and showers that will be installed. They should be starting sometime this week. Some progress on the deck was completed last week but no sign of Hutchins today.
Monday, February 4, 2008
Electrical Conduit
Posted by
Unknown
at
Monday, February 04, 2008
Subscribe to:
Post Comments (Atom)
Vermont Weather
View a flash tutorial on how to install netWeather:
http://netweather.accuweather.com/tutorial/tutorial2.html.
No comments:
Post a Comment