Yesterday the footings were poured. Wink and his crew did a fantastic job. Everything seems to be going fast now, and I hope it stays smooth sailing. The basement walls will be put in on Thursday. The back filling is also scheduled for Thursday. The logs will be delivered on the 19th of October. Anyone that wants to come and watch is more than welcome. In the picture with the cement truck shows the first cement going into the forms. There will be a walk out basement on the lake side. A steel beam was ordered on Monday at Mac's Steel in Rutland. I took a trip with the plans in the afternoon. Construction start date is October 21st. I will give a list of materials for the first floor decking to RK Miles Lumber when we get back from Washington on Tuesday. Keep looking for new updates!
Paul
Wednesday, October 10, 2007
We Now Have A Solid Base to Build On
Posted by
Unknown
at
Wednesday, October 10, 2007
Subscribe to:
Post Comments (Atom)
Vermont Weather
View a flash tutorial on how to install netWeather:
http://netweather.accuweather.com/tutorial/tutorial2.html.
No comments:
Post a Comment