Tuesday, February 3, 2009

Latest Update



















Your long awaited update is n here for your pleasure to read. The bamboo floors were completed in January as well as the plumbing and heating by Macintyre. We have had many snow storms to dig out from, but work continues to complete the log home. The baseboard trim was completed in the down stairs bathroom and the green room was also finished as well as the hall way. The larger bedroom which we call Casey's red room is about half done with only the ceiling trim left. Patti painted both rooms and has been decorating through out the house. We spent the last weekend working at the house and completed many jobs and also started a few to boot!! We are making a log bed for one of the rooms from some of the white cedar logs we bought. Although the basic frame is completed the detail work will add to the beauty of this bed.

Work on the stairway is also in progress I've added the bamboo to the face and sides of the steps. and the new log railings are being fabricated. Because the logs are fresh cut this winter they need some drying time before I can install them. We will be putting carpet just on the steps because the flooring is very slippery and the risk of falling is to great. This small area is the only area that will have carpet.
As you can see by the pictures there has been a lot of work completed.

With only a small list of jobs left, the house has become the home of our dreams!

Vermont Weather

View a flash tutorial on how to install netWeather: http://netweather.accuweather.com/tutorial/tutorial2.html.